1. Understanding the Role of a Bank Empanelled TEV Consultant in Project
Financing
When a company approaches a bank for a term loan, the lender
is not simply interested in knowing how much money the promoter wants. The bank
needs to understand whether the proposed project can actually be implemented,
whether the estimated investment is reasonable, and whether the business will
generate enough cash flow to repay the loan. This is where a bank empanelled
TEV consultant becomes important.
A Techno Economic Viability assessment examines a project
from technical, financial and commercial perspectives. It helps the lending
institution understand the practical feasibility of the proposed investment
before taking a credit decision. For a manufacturing unit planning capacity
expansion, a solar power developer setting up a new plant, or a healthcare
company establishing a hospital, this assessment can reveal issues that may not
be visible in the promoter's project report.
A bank empanelled TEV consultant is a professional
consulting firm or technical agency whose services are accepted by a particular
bank or financial institution for conducting these assessments. The empanelment
matters because lenders want an independent examination of the project rather
than relying entirely on the information submitted by the borrower.
However, there is an important distinction. Being empanelled
with one bank does not automatically mean that a consultant is empanelled with
every other bank. Different lenders may maintain their own approved consultant
panels, eligibility conditions and reporting requirements.
2. Why Banks Prefer TEV Consultants From Their Approved Panels
A bank sanctions large project loans only after examining
several aspects of the borrower and the proposed investment. For a substantial
manufacturing or infrastructure project, the lending decision may involve
multiple departments, technical reviewers and senior credit authorities.
The bank therefore needs confidence in the quality of the
information presented to it.
This is one reason financial institutions prefer appointing
consultants from their approved panels. An empanelled professional is generally
expected to meet the institution's eligibility requirements, professional
standards and reporting expectations.
But there is another practical reason. Banks want
consistency.
Suppose two manufacturing companies approach the same bank
for expansion finance. One submits a TEV report with detailed machinery
specifications, cost analysis, implementation schedules and financial
projections. The other submits a report containing only broad project costs and
projected profitability.
Comparing the two proposals becomes difficult.
An approved consultant working within the bank's reporting
framework is expected to address the lender's specified areas of examination.
3. Key Responsibilities of a Bank Empanelled TEV Consultant During Loan
Appraisal
The responsibilities of a bank empanelled TEV consultant
begin well before the final report is submitted. A proper assessment requires
discussions with the promoter, examination of project documents, technical
evaluation and financial analysis.
The consultant must understand the proposed investment
rather than simply reproduce information from the DPR.
Reviewing the Project Concept and Investment Proposal
The first responsibility is understanding what the borrower
intends to establish or expand.
For an existing industrial unit, the consultant may examine
its current production capacity, machinery, utilisation levels, financial
performance and proposed expansion.
For a new project, the assessment may focus more on the
promoter's experience, technical arrangements, project location, market
opportunity and implementation plan.
Take the example of an MSME planning to establish a food
processing facility. The promoter may have identified a building and received
machinery quotations.
However, the consultant must examine whether the selected
equipment can handle the expected production volume and whether the facility
has adequate storage, power, water and other essential arrangements.
A mismatch at this stage can affect the entire project cost.
Verification of Project Cost
Project cost is among the most closely examined components
during TEV assessment.
Banks need to understand whether the proposed investment is
realistic and whether the borrower has considered all necessary expenses.
The assessment may include:
- Land
and site development.
- Building
and civil construction.
- Plant
and machinery.
- Electrical
installations.
- Utilities
and supporting infrastructure.
- Preliminary
and pre-operative expenses.
- Interest
during construction.
- Contingencies.
- Margin
money for working capital.
A frequent issue in industrial proposals is the omission of
supporting infrastructure costs. A promoter may calculate the machinery
investment correctly but overlook transformer installation, internal roads,
storage facilities or effluent treatment arrangements.
These expenses eventually have to be funded. If they were
not included in the original project cost, the borrower may need additional
capital.
Examination of Technical Feasibility
The consultant evaluates whether the proposed project can
operate as intended.
For manufacturing companies, this may involve reviewing
production processes, machinery capacity, technology selection, equipment
specifications and availability of utilities.
For a solar project, the examination may include the
proposed technology, generation assumptions, land availability, connectivity
arrangements and technical design.
For a hospital, the consultant may examine the planned
number of beds, medical equipment, infrastructure, specialist requirements and
operational readiness.
The objective is to identify technical weaknesses that could
affect project implementation or future operations.
Financial Viability and Repayment Assessment
Technical feasibility alone does not make a project
bankable.
A company may have excellent machinery and a suitable
factory location but still struggle if its sales projections are unrealistic or
its debt burden is too high.
The consultant examines projected revenue, operating
expenses, profitability, cash flows and repayment obligations.
Common financial parameters include:
|
Financial Parameter |
What It Helps Examine |
|
DSCR |
Capacity to service loan principal and interest |
|
IRR |
Expected return generated by the project |
|
NPV |
Present value of expected future cash flows |
|
Break-even Point |
Sales level required to cover costs |
|
Debt Equity Ratio |
Relationship between borrowed funds and promoter
contribution |
|
Working Capital Requirement |
Funds needed for routine business operations |
These figures should not be examined in isolation. A
reasonable DSCR may still hide cash flow problems if the business depends on
delayed customer payments or has significant seasonal requirements.
Site Inspection and Promoter Discussions
Where required by the assignment, the consultant conducts a
site visit to understand the actual project conditions.
For an existing manufacturing unit, this may involve
examining installed machinery, production arrangements, storage, utilities and
the general condition of the facility.
For a proposed greenfield project, the consultant may
inspect the land, approach roads, surrounding infrastructure and development
status.
Discussions with the promoter are equally important. The
promoter may have commercial arrangements or operational experience that are
not clearly reflected in the documents.
A good assessment brings these details into the evaluation
instead of treating the DPR as the only source of information.
4. Projects That Commonly Require a Bank Approved TEV Assessment
Not every business loan requires a formal TEV study. Banks
decide the requirement based on project size, complexity, exposure, industry
risk and their internal credit policies.
However, when the proposed investment involves substantial
capital expenditure or specialised technical infrastructure, an independent TEV
assessment is often required.
A bank approved TEV assessment is particularly relevant when
the lender needs an independent opinion on the project's technical feasibility
and economic viability.
Manufacturing and Industrial Expansion Projects
Manufacturing companies frequently require TEV assessment
when setting up new plants, purchasing machinery or expanding production
capacity.
Consider an established engineering company planning to
invest ₹20 crore in a new production line.
The promoter may already have customers and an established
distribution network. However, the bank needs to understand whether the
additional capacity can be utilised and whether the proposed machinery will
generate sufficient revenue.
The assessment examines production capacity, machinery
costs, raw material requirements, market demand and projected financial
performance.
It may also identify whether the company requires additional
working capital after expansion.
Solar and Renewable Energy Projects
Solar power projects involve significant upfront investment
and depend on technical and commercial assumptions.
A lender may require an assessment of:
- Solar
module and inverter specifications.
- Proposed
generation capacity.
- Land
availability and suitability.
- Grid
connectivity.
- Power
evacuation arrangements.
- Project
implementation schedule.
- Power
purchase arrangements, where applicable.
- Estimated
generation and revenue.
- Operating
and maintenance costs.
For example, a solar developer may project attractive annual
revenue based on expected electricity generation. However, generation estimates
must be examined against site conditions, technical specifications and
applicable project assumptions.
A small difference in generation or implementation timelines
can affect projected cash flows.
Hospital and Healthcare Projects
Healthcare infrastructure requires a different type of
project evaluation.
A hospital promoter may seek term finance for land
development, building construction, medical equipment and other infrastructure.
The consultant examines whether the proposed hospital size
is appropriate for the location and expected patient demand.
Bed capacity, equipment requirements, staffing expenses,
operating costs and expected occupancy levels all influence financial
viability.
A project with expensive medical equipment but insufficient
operating revenue may face repayment difficulties despite having substantial
physical infrastructure.
Warehouse and Logistics Infrastructure
Warehousing projects are increasingly relevant to industrial
and commercial borrowers.
A company planning a large warehouse may require finance for
land, construction, material handling equipment, fire safety systems and
supporting infrastructure.
The TEV assessment examines the location, accessibility,
storage capacity, expected occupancy, rental assumptions and operating
expenses.
A warehouse in an industrial location with limited customer
demand may not generate the revenue projected by its promoter.
Other Projects Requiring TEV Assessment
|
Project Category |
Important Areas of Examination |
|
Educational Institutions |
Infrastructure, enrolment, fee assumptions and operating
expenses |
|
Real Estate Projects |
Development cost, sales assumptions and project cash flow |
|
Food Processing Units |
Raw material supply, production capacity and market demand |
|
Infrastructure Projects |
Construction cost, implementation risk and revenue model |
|
Textile Units |
Machinery, capacity utilisation and working capital |
|
Chemical Industries |
Technology, utilities, environmental requirements and
operating costs |
The bank ultimately determines whether a formal TEV report
is necessary. Some projects may require additional specialised reports
depending on the industry and lending structure.
5. Financial, Technical and Commercial Factors Examined During TEV
Evaluation
A TEV assessment becomes useful when technical information,
financial projections and commercial assumptions are examined together.
Looking at only one of these areas can create an incomplete
picture.
For example, a manufacturing unit may have technically
suitable machinery and a well-designed factory. But if the company cannot
procure raw materials at competitive prices or sell its products at the assumed
rates, the project may not generate the expected returns.
This is why a bank empanelled TEV consultant needs to look
beyond the numbers presented in the project report.
Technical Factors
Technical evaluation focuses on whether the project can be
established and operated as proposed.
The consultant examines the production process, equipment
specifications, installed capacity, technology requirements and availability of
essential infrastructure.
For a manufacturing unit, machinery capacity should match
the proposed production target. If the promoter plans to manufacture 10,000
units per month, the consultant needs to understand whether the proposed
equipment and operating arrangements can support that level.
Other considerations include:
- Availability
of electricity and water.
- Factory
layout and material movement.
- Machinery
installation requirements.
- Environmental
and statutory considerations.
- Skilled
manpower availability.
- Technology
suitability.
- Construction
and commissioning schedule.
A project may be technically feasible but require
modifications before implementation. These observations should be clearly
reflected in the assessment.
Financial Factors
Financial evaluation examines whether the project can
generate adequate returns and meet its financial obligations.
The consultant reviews the proposed project cost, promoter
contribution, term loan requirement and working capital arrangements.
Financial projections are generally examined over the
expected project period, taking into account revenue, operating expenses,
depreciation, interest and taxation.
Debt servicing is particularly important.
A business may report accounting profits but still face cash
shortages because customers take longer to pay or inventory remains blocked for
extended periods.
For this reason, projected cash flow and repayment capacity
need careful examination.
One important area is working capital assessment. A growing
manufacturing company may require additional funds for raw materials,
inventory, wages and receivables. If these requirements are underestimated, the
borrower may struggle even after completing the project.
Commercial Factors
Commercial viability concerns the project's ability to
generate demand and earn revenue under realistic market conditions.
The consultant may examine:
- Existing
and potential customer base.
- Industry
demand.
- Competition.
- Selling
prices.
- Raw
material procurement arrangements.
- Distribution
channels.
- Customer
concentration.
- Existing
orders or business contracts.
- Expected
market penetration.
Suppose a promoter plans to establish a packaging unit based
on projected demand from a few large customers.
The consultant should examine whether those customers have
confirmed purchase arrangements or whether the projections are based only on
informal discussions.
This distinction can significantly affect the assessment.
Why Sensitivity Analysis Matters
Financial projections depend on assumptions. Actual business
conditions rarely follow the exact estimates prepared at the beginning of a
project.
Sensitivity analysis examines how changes in important
assumptions affect financial performance.
For example, a project may be evaluated under different
conditions:
|
Variable |
Possible Change |
Potential Impact |
|
Project Cost |
Increase in construction or machinery cost |
Higher funding requirement |
|
Sales Revenue |
Lower than projected sales |
Reduced cash generation |
|
Raw Material Cost |
Increase in input prices |
Lower operating margins |
|
Interest Rate |
Increase in borrowing cost |
Higher debt servicing burden |
|
Implementation Period |
Delay in commissioning |
Additional interest and delayed revenue |
A project that remains financially viable under reasonable
adverse conditions may be viewed differently from one that depends entirely on
optimistic assumptions.
The consultant should explain these risks rather than simply
presenting attractive financial ratios.
I might be wrong here, but in many project financing
discussions, promoters spend more time negotiating loan amounts than examining
the assumptions behind their own financial projections. That approach can
create problems much later.
A bank empanelled TEV consultant helps bring these issues
into the open before the lending institution reaches its final decision. The
assessment is not a promise of funding, but it gives both the borrower and the
lender a clearer understanding of what the project involves, where the risks
lie and what needs attention before implementation.
6. Documents Banks Expect Before Starting a TEV Assessment
A TEV assessment can get delayed even before the actual
evaluation begins. The reason is often incomplete documentation. Promoters
sometimes approach a bank with a project proposal but have not finalised
machinery quotations, land documents, financial projections or even the
estimated project implementation period.
For a bank empanelled TEV consultant, these documents are
important because the assessment must be based on verifiable information rather
than assumptions made during initial discussions.
The documentation requirement depends on the nature of the
project. A new manufacturing unit, an existing industrial company planning
expansion and a solar power project will not have identical requirements.
Project and Technical Documents
The consultant generally requires the following information
to understand the proposed investment:
- Detailed
Project Report or preliminary project report.
- Land
ownership documents or lease agreements.
- Site
layout and proposed building plans.
- Civil
construction estimates.
- Machinery
quotations with technical specifications.
- Production
capacity and manufacturing process details.
- Power,
water and other utility requirements.
- Project
implementation schedule.
- Environmental
clearances and statutory approvals, wherever applicable.
For example, a manufacturing company planning to establish a
pharmaceutical packaging unit may submit machinery quotations showing the
purchase price. However, the consultant also needs to understand the production
capacity, installation requirements, supporting utilities and compatibility of
the equipment with the proposed manufacturing process.
A quotation alone does not establish technical suitability.
Financial and Banking Documents
The financial position of the promoter and the proposed
business is another important part of the assessment.
|
Documents |
Why They Are Required |
|
Previous three years' audited financial statements, where
applicable |
To examine historical performance |
|
Income tax returns |
To understand reported income and financial position |
|
Provisional financial statements |
To review current business performance |
|
CMA data |
To examine projected financial information |
|
Existing loan sanction letters |
To understand borrowing conditions |
|
Outstanding loan statements |
To assess existing repayment obligations |
|
Bank statements |
To review financial transactions |
|
Promoter contribution details |
To examine the source of proposed equity |
|
Projected cash flow statements |
To evaluate repayment capacity |
For an existing business, the consultant may also examine
details of outstanding creditors, debtors, inventory and contingent
liabilities.
These details are particularly important when the borrower
is seeking expansion finance. A company may have good sales figures but also
carry substantial outstanding receivables. Ignoring this aspect can result in
an incorrect working capital assessment.
Commercial and Supporting Information
Commercial documents help establish whether the proposed
project has a reasonable business opportunity.
Depending on the industry, the consultant may request
customer details, purchase orders, supply agreements, raw material quotations,
market information and existing sales records.
A warehouse developer, for instance, may have projected
rental income based on expected occupancy. Letters of intent or preliminary
agreements with potential tenants can provide useful support for those
assumptions.
Similarly, a solar developer may need to provide power
purchase arrangements, connectivity information and relevant technical
documents.
Why Proper Documentation Matters
There is a practical difference between having documents and
having the right documents.
A promoter may submit 100 pages of project information but
still leave important questions unanswered. Sometimes the machinery quotation
is outdated, the project cost does not match the DPR, or the promoter
contribution has no clear source.
These gaps create additional queries.
My suggestion is to prepare a project-wise documentation
folder before approaching the lender. Keep technical, financial, commercial and
legal documents separately. This makes the initial review easier and reduces
unnecessary communication between the borrower, consultant and bank.
A bank empanelled TEV consultant can also provide an initial
document checklist based on the lender's requirements and the nature of the
project.
7. Common Reasons Banks Raise Objections in TEV Reports
Submitting a TEV report does not mean that the bank will
accept every recommendation without questions. Lenders may raise objections
when the report contains inconsistencies, important information is missing or
the project assumptions require further examination.
Some objections are related to the consultant's assessment.
Others originate from information provided by the borrower.
Understanding the difference is important because the
response will depend on the actual reason behind the objection.
Difference Between DPR Figures and TEV Assessment
One common issue is a mismatch between the project cost
mentioned in the DPR and the cost examined during the TEV study.
Consider an industrial unit proposing an investment of ₹30
crore. The DPR may show machinery expenditure of ₹12 crore, while the available
supplier quotations indicate a different amount.
The bank may ask why the figures do not match.
The consultant may need to examine whether the original
estimate included installation, transportation, electrical work and other
related expenses.
The borrower should provide supporting information instead
of simply requesting the consultant to retain the original project cost.
Unrealistic Production and Sales Projections
Banks carefully examine revenue assumptions because the
project's repayment capacity depends on the cash generated from operations.
A newly established manufacturing unit may project 90%
capacity utilisation within a short period. However, reaching that level may
require customer approvals, production stabilisation, distribution arrangements
and regular procurement of raw materials.
If the projections do not explain how the business will
achieve the proposed sales, the lender may raise questions.
A bank empanelled TEV consultant should examine capacity
utilisation, expected selling prices, market demand and the time required to
establish commercial operations.
Inadequate Promoter Contribution
Promoter contribution is not just a number entered in the
means of finance statement.
Banks need to understand where the contribution will come
from and whether the promoter can arrange it within the required timeframe.
Suppose a company proposes a ₹40 crore project with a
promoter contribution of ₹10 crore. The bank may ask for supporting financial
information to establish the availability of these funds.
If the contribution depends on selling another property or
receiving funds from an associate company, the timing and certainty of that
arrangement may need examination.
Weak Working Capital Assessment
This is one area where otherwise promising projects can face
difficulties.
A manufacturing unit may arrange sufficient finance for
machinery and construction but underestimate the funds required for inventory,
salaries, electricity and customer credit.
Suppose a company supplies products to industrial customers
on 60-day credit terms. It must continue purchasing raw materials and paying
operating expenses while waiting for customer payments.
If the working capital assessment does not account for this
cycle, the company may experience a shortage of funds after commercial
production begins.
Banks may therefore ask for revised working capital
calculations and additional supporting information.
Technical and Financial Inconsistencies
Other reasons for objections include:
- Machinery
capacity not matching the proposed production target.
- Missing
statutory approvals or unclear project permissions.
- Incorrect
interest and repayment calculations.
- Unrealistic
operating expenses.
- Inadequate
provision for maintenance.
- Delays
in the proposed implementation schedule.
- Insufficient
explanation of project risks.
- Financial
projections that do not match the assumptions in the technical assessment.
A report should address these issues before submission
wherever possible.
Responding to Bank Objections Properly
The borrower should first understand whether the bank is
seeking clarification, additional documents or a change in the original project
proposal.
These are different situations.
If the bank questions the machinery cost, revised quotations
may be required. If it questions repayment capacity, the financial projections
may need to be examined again. If the concern relates to technical feasibility,
additional engineering details may be necessary.
An experienced bank empanelled TEV consultant can help
identify the basis of these observations and prepare suitable clarifications.
However, every objection cannot be resolved through a
revised report. Sometimes the project itself requires changes in investment,
capacity or implementation planning.
8. How to Select the Right Bank Empanelled TEV Consultant for Your Project
Choosing a TEV consultant should not be treated as a routine
administrative decision. The quality of the assessment can influence how
clearly the lender understands the project and its financial risks.
Professional fees are one consideration, but they should not
be the only deciding factor.
A consultant who understands the industry, the bank's
reporting expectations and the financial structure of the proposed investment
can make the assessment process considerably more useful.
Check the Bank's Empanelment Requirements First
Start by confirming which consultant panels are accepted by
your lending institution.
Empanelment with one bank does not necessarily establish
eligibility with another. Banks and financial institutions may have different
requirements regarding qualifications, professional experience, assignment
categories and reporting formats.
Before making an appointment, confirm that the consultant is
eligible for the particular assignment.
This simple step can prevent avoidable complications later.
Look for Relevant Industry Experience
Industry knowledge is particularly important for technical
evaluation.
A consultant assessing a textile manufacturing project
should understand production capacity, machinery requirements, utilities and
working capital. A solar project requires familiarity with generation
assumptions, equipment specifications and grid connectivity.
Similarly, a hospital project involves a different set of
commercial and operational considerations.
Ask whether the consultant has handled projects of a similar
nature and scale.
The important question is not simply how many reports have
been prepared. It is whether the consultant understands the technical and
commercial issues associated with your proposed investment.
Understand the Scope of Work
Before appointing a bank empanelled TEV consultant, clarify
the expected scope of the assignment.
Some assignments may require a detailed review of project
documents, while others may involve physical inspection, technical verification
and discussions with project management.
The engagement should clearly cover:
- Documents
required from the borrower.
- Technical
and financial areas of assessment.
- Site
inspection requirements.
- Reporting
format.
- Clarification
and revision process.
- Expected
completion period.
- Professional
fees and applicable taxes.
This avoids confusion about responsibilities once the
assignment begins.
Examine the Quality of the Report
A good TEV report should explain the reasoning behind its
conclusions.
For example, if the consultant considers a particular
production capacity feasible, the report should explain the technical
assumptions supporting that assessment.
Similarly, financial projections should be connected with
production levels, selling prices, operating costs and repayment obligations.
A report containing attractive financial ratios but very
little explanation may not provide sufficient clarity to the lender.
Be Careful About Guaranteed Loan Approval Claims
No consultant can independently guarantee that a bank will
sanction a loan.
The consultant's responsibility is to evaluate the project
and provide an independent professional assessment. The lending institution
retains the authority to examine the borrower's creditworthiness, security,
repayment capacity and other applicable requirements.
A consultant who promises guaranteed approval should be
approached cautiously.
I would give more importance to honest reporting than to
attractive promises. A project may have certain weaknesses, and understanding
them before borrowing is often more valuable than receiving an overly positive
assessment.
9. How Frontline Consultants Supports Banks, Borrowers and Industrial
Projects
Financial institutions and borrowers often approach project
advisory from different perspectives.
A bank wants to understand the technical feasibility,
project cost, financial viability and repayment risks. A promoter wants to
establish whether the investment makes commercial sense and how it can be
funded.
Both require reliable financial and technical information.
Frontline Consultants is a financial and project advisory
firm with more than 30 years of experience in supporting businesses, industrial
projects and financial institutions through specialised consulting services.
Its work covers project evaluation, lender-related
assignments, financial advisory, valuation and debt-related consulting.
Techno Economic Viability Reports
TEV assessment is an important requirement for many
industrial and infrastructure projects seeking institutional finance.
Frontline Consultants provides Techno Economic Viability
Reports covering the technical, financial and commercial aspects of proposed
investments.
For a manufacturing company planning capacity expansion, the
assessment may involve reviewing machinery costs, production capacity, project
implementation, working capital and projected cash flows.
For a new infrastructure project, the evaluation may focus
on technical arrangements, investment requirements, implementation risks and
expected revenue.
The assessment helps stakeholders understand whether the
proposed investment is supported by reasonable assumptions.
Lenders Independent Engineer Services
Lenders Independent Engineer services support financial
institutions that require independent technical assessment and monitoring of
projects.
Depending on the assignment, this may involve reviewing
construction progress, examining implementation milestones, assessing technical
developments and reporting significant deviations.
For a large industrial project, the lender needs to know
whether the project is progressing according to the approved plan and whether
any major technical issues could affect implementation.
Agency for Special Monitoring
An Agency for Special Monitoring assignment helps lending
institutions examine the progress and financial developments of selected
borrower accounts.
The scope may involve monitoring fund utilisation, project
implementation, financial performance and significant deviations, as required
by the lender.
This is particularly relevant where a financial institution
wants additional oversight of a substantial project exposure.
Detailed Project Reports and Project Advisory
A Detailed Project Report provides the foundation for
project planning and funding discussions.
Frontline Consultants supports businesses with project
documentation covering investment estimates, technical planning, implementation
requirements and financial projections.
This is relevant for promoters who need to understand their
proposed investment before approaching banks or other financial institutions.
Valuation and Debt Related Consulting
Businesses may also require specialised financial services
at different stages of their operations.
Frontline Consultants offers services such as:
- Enterprise
Valuation.
- Asset
Valuation.
- Credit
Syndication and Debt Syndication.
- Debt
Restructuring.
- Bank
Liaison.
- Project
Advisory.
- Business
Financial Consulting.
For an industrial borrower facing repayment difficulties,
debt restructuring may become relevant. A business planning a transaction may
require enterprise or asset valuation. A promoter seeking institutional finance
may need assistance with project funding and lender-related documentation.
The appropriate service depends on the financial position
and requirements of the business.
Working With Banks and Borrowers
An important part of financial consulting is understanding
that the borrower's expectations and the lender's requirements are not always
identical.
A promoter may focus on the amount of finance required,
while the bank may be more concerned about repayment capacity, project
implementation and the availability of funds for completing the investment.
Frontline Consultants works across these areas through its
financial and project advisory services.
For businesses looking for a bank empanelled TEV consultant,
it is advisable to discuss the proposed project, the relevant bank's
requirements and the scope of the assignment before proceeding. The specific
empanelment applicable to the concerned lender should also be confirmed.